HEADQUARTERS, Joint Task Force SEVEN

Washington 25, D. C.
10 November 1953
Annex H to CJTF SEVEN Operation Plan No. 3.-53

NAVAL TASK GROUP SUMMARY OF TASKS (1G 7.3)
The following is a summary of tasks to be accomplished by the

Naval Task Group during the CASTLE on-site operational phase.
7.3 will:
bys

a.

CTG

Provide for the security of the ENIWETOK-BIKINI danger area

(1) Denying entry of unauthorized vessels and aircraft into

the closed area in accordance with instructions to be issued at a
later date.

(2) Maintaining a plot of ships and aircraft transiting the
danger area,
(3) Providing a capability for rapid surface movement of
ground defense forces between ENIWETOK and BIKINI in the event of
emergency.

(4) When directed before each shot, patrol the significant

sector out to 600 miles to detect, report and warn surface shipping.

b.

At BIKINI, operate a boat pool in accordance with Annex P, Boat

Plan. Be prepared to operate the boat pool from other task force
ships when the LSD is engaged in transportation of experimental weapons and devices.
c. Provide an inter-atoll surface transportation system to support
joint task force elements in the forward area. Annex P, Boat Plan,
applies.
d.

Control harbor operations at ENIWETOK and BIKINI.

e.

Detail two (2) PBMs and required personnel to CTG 7.4 for opera-

tional control, to augment the ENIWETOK-BIKINI airlift system and to
provide amphibious airlift services between ENIWETOK and BIKINI when
required,
f£.__Provide—transportation_for-timitedair supply of weather staOAs
Seat
Lsh-CTS—344

Tons;

F

.

. Provide shipboard assembly facilities for the experimental weapons and devices and limited laboratory, shop and office space for

TG 7.1.

> ‘y. As directed, transport the experimental weapons and devices and
the necessary barges and associated personnel between and within

ENIWETOK and BIKINI ATOLLS.

Provide suitable escort in transit and

conduct rehearsals of this activity as required,

tt x.

Gperate a ship-to-shore and inter-island helicopter lift system

at EIKINI to support pre-shot operations and post~shot flights for
damage survey and recovery of scientific data. Be prepared to
assist CTG 7.4 in the conduct of this activity at ENIWETOK upon conclusion of BIKINI operations, Annex Q applies.
H-1

Select target paragraph3