ore

ATADCIASTERS, Joint Task Force SEVEN
Wa-hington 25, D. fc.
16 Novewrher 1952

Anrev 2 tr 37? STTEY Oneration Plan Ho

2-53

SCTENTTTTC
TASK GilUE StMMvany OF TASIS (Tt 7.1)
bon oe
The folic-irs 18 @ sumury of task= ‘0 be accomplished by the
Selertific Task Grouc darinz the CASTLE on-site operations] phase.
CT 7.2 will:
&

Posstion, aru aad detonate the weacons and devices.

*

Tonduet tecnnical and measurement. programs (Annex EB applies).

.

“suplets the anstalliwticn and calibration of the devices and all

suSstraments and (23% apparatus.
“7

fo. Reo amend t+ CTP SEVEN safe slant range distances from ground
et
rv ssreraft during shot periods.

Cuciuet the radiological safety oregram (Annex N applies).
fo

Perovic: “Leshnical ard technical report fila coverage in conform

&
Sree the inter-atoll movement of weapons ard devices and
provide reyuive) teennical ausistence bo other task grours in connection +.ta thear respansibiiities Cor such movements.
4

Be resronsivie for the removal of all 7 7.2 personnel and neces-

sary @guirment froaq the sho”. site danger area,

zt. Waer hirected by CUTP SEVEN, evacuxte 7 7.1 personnel from
BIZINT atin
~
8 greparet. upon directive from CUTF SEVEN, to conduct emergen=cy post shot evicustion of 7 7.1 personnel from ENIWETCK ATCLL.
»
Keer Cour SEVEN informed on test and technical develooments
affectiz: the ocerational plan and malitary support requirements
tserefor

2. Prepare a;prvpriate technical reports at the conclusion of each
shot and the overall operation (Annex E applies).
m, Provide CTP SEVEN with a statement of preliminary test results
at Hooi.s 2, 2 plus 12 and H plus 72 hours.

o

TAL:

0Z

C. AMS.

P. W. CLARKSON

/

COWARTGZR

Colonel, U.S. Airlfurze
Assistant Chief cf Staff, J-3

Major General, U.S. Arny

Commander

Select target paragraph3