Appendix PROJECT SUMMARIES Brief summaries of the specific activities of each Castle project are presented herein as a complement to the more-general discussion of the test programs contained in Chapters 2 through 9. The shot participation of the various projects ia summarized in Table A.1. A few of the final project reports were as vet unpublished at the time this final summary report was prepared. In general, the draft manuscripts of such reports were available and were consulted in order to make these project summaries as cumplete as possible. In any case, the published versions of the final (WT) project reports should he referred to for complete, final information. ‘The report title and short title (WT nurober) are indicated herein for each project; information on the availability of these reports maybe obtained from Headquarters, Armed Forces Special Weapons Project, Washington, D. C. TABLE A.t PROJECT SHOT PARTICIPATION 1.la 1.ib l.le l.ld 1.2a 1.2b 135 1.4 1-5 1.6 1.7 1.8 2.) 2.2 2.3 2.5a 2.5b 2.6a 2.6b 2.7 2.7a pro to the DOD. See Text. by and of interest 105

Select target paragraph3