.
33058

|

&aor aj

15 February 1997

scheduledinterwatoll airlift was used for their movement the majority of the
time, and such airlift would be used again to the maxlmm extent. However, -

with the increased nuxber of shots scheduled for YARDTACK, it is believed

that the requirenent for expeditious mevenent of key TG 7.1 personnel will de
increased. Therefore, thougi maximum use of the routine airlift will be

made, access to some suitable aircraft should be granted CTG 7.1 whm tho
schoduled intereatoll airlift can not satisfy his movencnt requirements.

h. Other requirements wiich are of vital concern to this Task Group,
but are the responsibility of other Task Grows have in art been covered in
the reference letters. Nevertheless, for comleteness, these are reiterated
in the inelosed sumary of military support items for Qmeration SARDTACK.

lL,

Wore detailed support requirements, which will be necessary fcr the

various scientific programs and projects, will be forwarded as more firm
Planning information becomes available. Uovever, currently proposed firing
scrios, even at this time, indicates thst some auxiliary Molds of support
requirements will be greater than on REDWING.

{

a,

Esxaaples are:

The requirements for samle return flight.

&, The requirements for M
: ATS and (STS sapport ‘for both the buildeup
and operational phases.

5. Shom in Section IV of Inclogure 1 are the support items required by |

the DOD projects.

As stated in paragraph 1.b. above, these requirencents have

been assexbled by Headquarters, AFSJP for presentation at the 20 February 1957

f

-

requirenents conference. Headquartere, AFSiP pointed out that no detailed
evaluation had been made of the req ested support, Cursory examination leads
ome to balieve duplication or ovar-lep may be present. Exauples.cf such are
particularly helicopters and boat pool craft. Umdoubtedly, sone of these
requirements can be satisfied by support provided TG 7.1 as a whole, As soon
as the program support can be examined, overeall requirezents will be adjusted
where possible,

6,

Attached as Inclosure 1 is the summary of military support items fer

-HARDTACK which are required far the support of TG 7.1.

It is requested that

this Headquartere be kept informed on the status and action taken in regard

FOR THE OOMUNDER:

MeL.

% Incl

E. A, WCKE
Jo3

Summary of widitary Support

Plans & Operations

Items for Overation HARDTACK

pisratayrrots $c SITMT CF

oy

2h = OTF SEVEN (Griffith) < 11A-1% © Le3, UCRL
3A
© JeDO (Graves)”

UA « LeDiv, UCRL Gsbbina)~ + Soe SP

ia ~ DS! (Ople~

ee

5A @ CTO 7.1 (Felt)

ote
215 finliioee)
- CTC 7.4

eC

e

o3

8

(iignali)

94 = CTO 7.5 (Reeves)

innene = D/& (Carey)e—

z

5-

\ 77 er ee

15h WETD (Parsons)

| - 2-7 o>

6A « d= (Kelly) =)

Yea 2 Sod toate
19AL WA © Jnu3
o

(Incke)

PLAZP2A -~ MLN LASL

tb

2A = Ke

$

Yobe

SHORERA2, 7.0

Select target paragraph3