i

Joint Task Force SEVEN
Task Group 7.3

ration Order
CTG 7.3 No. 5=54

Eniwetok, MJ.

27 PEB 4

=6z0O mM

Annex A
Schedule of Events and Movements

All movements and events in this schedule are designed to insure a thorough
test of a special device barge while it is subjected to the motion it will undergo when being transported to a shot site and to prepare the USS BELLE GROVE to
safely provide that transportation expeditiously in the future.
MIKE Date and Time
of Commencement

Event,

200830

BELLE GROVE anchored in Berth C-1, ENIWETOK; commence
building special cribbing in well,

201430
201500

TU 7.3.9 is formed.

4 eves Spt eo

wee
One ship of TE 7.3.9.2 anchor in berth C-2 to give al]
_ possible military assistance to USS BELLE GROVE.
EELLE GROVE anchored in berth C-1, flooded down to

201530

maximum dra

ow

aN

201530

>

-ready to receive special barge _™

TG 7.5 forces begin to move special barge from slip to
PARRY Island,

201615 : (Apprax)

Barge arrives at stern of BELIE GROVE.

201645 (Approx)

Barge in place over special cribbing. Commence pumping
up. Insert shoring and wedges, TG 7,2 military police
arrive on barge for safeguarding device,

6a

201740

r

High tide ~ 4.5 feet,
BELLE, GROVE well dry. Complete securing barge in place
with chains and wires as in earlier dummy mn.

201800

Borge completely secured in BELLE GROVE well,

201800

BELLE GROVE

pumped up to normal draft, Rig lights in well to give
illumimtion on barge and in vicinity without light

shining directly up or horizontally outside of ship.
aed at
Sunset.
RG 37H SJerense Nuccenr
te cdi

201920

cr

—

;

Sty

Locaiton WNRC
Access No. GEA 1740

Bex Y9

AnlpviderSTF 7 CTE 23 —
56

Select target paragraph3