This is NADL, with CRL putting some additional collectors in the land
stations.

Between-shot problems are major — recovery and putting then out again,

It appears it will require 2 or 3 ships just to do this job.

mp

266 | is all off-site lab studies of samples from 2.5.
2.pAs PQs

sunnyGs PROGRAM TiO:
3.2

47 — (round off) ~ TOTAL ~ 50.

Tobedang by DOD.

Photography by Lookout Mountain.

SUMMATION oFFeigonan THREE: 10
4.1

TOTAL = 10

Thisisa question-narked progran, but they will put same mmbers down

for it.

i:

P

Rasy

Kcacaned

Ogle: we would 1iké to know as soon as you do know, what you propose
doing with the mi¢é before they are positionod; if it takes another

island, we should/kpow about it.
?
Bd

z
Raat

oo,

Shot participation is Gabstionable. Ogle: fram the point of view of

getting a neutron spec
-—~ if you're on the,
} you'll got
primarily a fission s
e
are vest itredthe point
of view of the experizent,
they do not want to have nice on barges,
so

is questionable

so on

the reef, (They put down
there were neutron measur

They will need to shield pretty
doesn't. think it is worth doing

within 2000 yards.

This does not rat

2500 to 3000 yards.

SUMMATION OF PROGRAM FOUR:

6

Ogle doeantt

‘without quite a structure,

Ul

Ul

ra

Again, is a question-marked program, but sane mnbbrs were put dom.
LI
This is the Liberty ship deal. Personnel estimate: total of 75 for

crew and experimental personnel.

fil

param oo

6.4

big structure.

TOTAL - |

No coments on 6.1, 6.2, — see table.
6.3

Also on 2.3, since

well or iil lose the mice. Scoville |
the
rinent if the effects are just

think you can keep a mouse alive there

even at

they would be working aon

ith a question mark.
s
olved there.)

wf f

re

. 43-

Select target paragraph3