were published by LASL and forwarded to the AFSWC just before REDWING

(Reference 29, pp. 220-225).

Figure 26 is a schematic illustration of the

setup for sample recovery.
A Filter Recovery Subsection in the Nuclear Applications Section of
the TAU was manned by one officer and three airmen.

These personnel were

responsible for removing all gaseous and filter paper samples

(Refer-

ence 29, Chapter 8).

0

WINGTIP TANK
PARTICLE SAMPLER

|

___GUN DECK
— GAS SAMPLER

25-50 feet

(8-15 meters)

SHIELDED BOX
\
TOW

VEHICLE

SHIELDED CAVE
/
f

o

==
o

TOOLS
Figure 26.

O

PERSON 1

rQ

—

TRAILER 1

C
PERSON 2

\, TRAILER 2
SIG

O

PERSON 3

Sample recovery schematic illustration, CASTLE.
140

Select target paragraph3