Table 10.

Summary of Bikini radsafe activities, CASTLE.

Time

Activity

D-5

Sweep of Bikini Atoll by LCM.

0-3

Weather central transfers operations from Parry to the Estes

D-2

Air and group sweep of Bikini Atoll.
patrol.

sites.

(AGC-12).

Begin personnel reduction at

Air and ground sweep of Bikini Atoll.

TG 7.3 begins 24-hour

(0900)

Shot-day weather outlook given to CJUTF 7.

(1100)

Radsafe Center operational on the Bairoko (CVE-115).

(H-36)

First command briefing.4

D-1

fork

plots presented.

F2Vv

Shot-day hodographs and transit ship

P2V search of possible fallout areas to 600 nmi (111 km).
(1100)

Second command briefing.?

Weather, existing and forecast

hodography, 72-hour air particle trajectory plot, transit ship
plots.

(1130)

Forecast air and surface radex areas for H-hour to H+6.

(1200)

Bikini evacuation complete.

(H-18)

Advisory to CINCPAC re fallout.

{1300)

Al] task groups account for personnel to CJTF 7.

(1800)

Final accounting of task force personnel to evacuation officPr.

(1900)

Ships leave Bikini Lagoon.

(0000)

Final command briefing.@

(H-5)

Modify forecast radex areas if necessary.

(H-3)

Informal weather briefing to CJTF 7.

(H-hour )

Detonation.

(H-hour to H+4)

Radiation data telemetered from Eneman and other critical loka-

(H+3)

Modify air and surface radex areas.

(H+4)

Wilson 2 cloud tracker directed to begin task.

D-day

tions.

Results reported periodically to CJTF 7.

jcal damage survey.

Radsafe and

Recovery timetable established.

areas of low contamination begins.

goon water samples.

TG 7.3 helicopter obtaing

(H+5)

Radsafe Center aboard the Bairoko (CVE-115) reports results

(H+9)

Sample return flights No. 1 and No. 2 depart from Enewetak.

initial atoll survey to CJTF 7.

Note:
Fat early command briefings, the execute order was confirmed.

126

phys-

Recovefy in

la-

Bf

:

Select target paragraph3