Staffing:
Six were associated with the project, including qhree ci-
vilians from NRL, two civilians from ORNL, and one military from Hq,
Military District of Washington.
Project Report:
Ae BS" et.
tats
3
Reference 52.
Project 2.5a -- Distribution and Intensity of Fallout
Agencies:
Naval Radiological Defense Laboratory (NRDL)
Naval Receiving Station, Treasure Island (NRS TI}}
USS Sioux, USS Apache, USS Tawakoni, USS Eppersor fF
USS Renshaw, and VP-29
Operations:
Fallout was collected from arrays of buoys anch ored pre-
shot in the lagoon (Figure 45) and floating free in the open
ocean,
and from “below grade" collecting stations located on nine
lands
throughout Bikini Atoll, except for the northwest section,
d four
islands
(Bokoluo, Enjebi, Elle, and Biken)
at Enewetak Atol
Recov-
ery occurred as soon as possible after shots; sample analysi
and data
Shots:
BRAVO, ROMEO, KOON, and UNION (Bikini); NECTAR (Ene
Radiation Exposure Potential:
tak).
Potential exposure existed f
all per-
sonnel involved in recovery operations and setting of array
after the
first shot.
ions
The pertinent project report notes that instru
stated that although “every effort should be made to recover the imSs Produce
portant stations as early as possible ... if recovered bu
dangerously high radiation fields aboard ship, it may be nec Pssary
to
break off and return to Eniwetok to off-load."
Staffing:
Twenty-four were definitely associated with this project,
twenty-one civilians and one military from NRDL and three mi Litary
from NRS TI.
Their exposures are given in Table 19.
Exposu res for
the personnel of ships and aircraft assisting in this projec
r
are
given in Table 59.
Reference 53.
179
,
Ws
Project Report:
oN
Th be
Mw
reduction were performed at PPG.