copy No,

NAPA - College Park
rnePositony
COLLECTION 46-51Seurhey ATOMIC ENERGY COMMISSION
BOX No, 03

(ww3-326-43- a7)

rower 471.6 (4-21-47)
Sands tone

Vel. 2.

Present:

409575

~=r)

L
July M,-1948. .

Meeting No, 179

3:00 p.m., Tuesday, June 15, 1948

David E. Lilienthal
Sumner T. Pike
Lewis L. Strauss
Robert F, Bacher
W. W. Waymack
Carroll L. Wilson
Roy B. Snapp

Also
Present:

Brig. Gen. James McCormack, Jr.
Captain James S. Russell, USN
Colonel Paul T. Preuss

1. Report of Test Director
Captain James Russell,

BEST COPYAVAILABLE
USN, AEC Test Director for 0]

SANDSTONE submitted his preliminary report to the Commiss:
He reported that the Commission's directive to the Test D:

(AEC 9/2) had been fulfilled, and three shots successfull:
He described the arrangements and implementation for the and the tests for the Armed Forces which were included in
perimentation.,

He reviewed the organization and cost of (

tion SANDSTONE and the philosophy of operations,

He repo

the condition in which the proving ground was left and co
on the significance of the results of the proof test oper
Mr. Lilienthal expressed the deep appreciation of t
mission to Captain Russell and to Doctor Froman,
absence,

in the l

for their successful work in the test program.

ienthal stated that the Commission shared the grave conce
Test Director over the lack of public recognition for the
pation of the scientists on the proof test operation,

CLASSIFICATIONCAN:

\
DOE NS! DECIASSINGAT 1ON
BY: DAVID WAQHER DUBIN Sco

EXTRACT COPY
Original filed: --.-/.--5

—

Geeaeniateniie

Th

Select target paragraph3