ne nnneeneen eneene neeeeeeeeeeeennneneen nennnnnanneenneeeeeee

Butternut

OPERATION HARDTIACK I -

TATE:

TIME:
~~

PPG Time

12 May 1958

0615

GMT

Sponsor:

11 May 1953

SITE:

1815

LASL

PPG - Eniwetok - SW of
Yvonne

4,000 ft from the nearest
edge of the island

119 20'
162 21'

i"
O02"

Site elevation:

HEIGHT OF BURST:

N
&

Sea level

10.13 ft

TYPE OF BURST AND PLACEMENT:
Surface burst from barge on
water

Water depth:

65 ft

CLOUD TOP HEIGHT:
35,000 ft MSL
CLOUD BOTTOM HEsIGHT:
NM

REMARKS:
Only individual island dose rates are available.
These were obtained
from helicopter surveys at H+4 hours made by the Radiological Safety
Organization.
The helicopter survey technique called for the pilot
either to land the aircraft at the desired spot, so that a ground reading
coula be obtained, or to make a slow pass over the desired spot at an
elevation of 25 feet.
Readings taken at 25 feet were multiplied by
a factor of 2 in order to obtain a reasonable approximation of the true
ground reading.
The basic instrument used in the aerial surveys was the

AN/PDR-39 survey meter modified to read up to 500 r/hr.

Thet--? decay

approximation was used to extrapolate the H+ hour dose-rate readings

to H+1 hour.

197

Select target paragraph3