SOPT TTT TTT yrrryerrry
_
[’Tropopaouse Height
re
_
53,000 ft.
~ 40

s

-

{.

ef

:

530

|

5
Bool

,

|
:

<4

ore

=

TF

2

LO

rr rrr rr pr rp
Cloud Top Height
38,000ft.
NY

LCS

La

31,800ft.
‘

Le

caeeneeerannnn

petisrttprrtrr t

0

Figure

4

67.

6

—

8
10
Time, Minutes

4

4

ao

Cloud Bottom Hgt 7

on:

22,000 ft.

;

104

~

4

|

4

7

epy te py ty
1Z

14

16

Lacrosse.
Operation REDVING Diameter-curve 1 represents the diameter of the main
cloud; curve 2 refers to a portion of the cloud which
resulted from a shear at 8 minutes; curve 3 represents
the average diameter of two clouds which resulted from
a shear of the second cloud at 15 minutes.
Cloud Dimensions:

7
4

Cloud Diameter No.3

2

0

MS

|_ICtous Diameter a2

/

rr
4
7

Cisud Dicmeter No. |

>

©

rrr

8

Select target paragraph3