Bikini atoll.

In addition, a broad pattern of free floating stations

(Dan buoys) extending 50 miles from zero will be instrumerited for

Shots 1, 3, 5 and 7.

The more extensive coverage for these three

events will serve the additional ;urpose of aiding the evaluation of

the Froject 6.4 experiment which is to be conducted during these same
events. In addition, 32 lagoon stations will be instrumented at

-hiWvetok for Shot Echo.
Remarks

rumentation will be processed ut =lmer nd trenshipned

to Tardcifer distribution.

Access to land stations for instrunicntation

and recovery-Will require boat and helicopter support.

utility (LGU)

a landing craft

“equipped with crane will be needed for raft station

instrumentation. Den buoy stations will require the full time support
of two vessélsfor several days before and after each of Shots 1, 3,
5 and 7. Samples will require transhipment to “lmer and courier
flights to USuaDE after each event.
3.5

Project umbers
Sponsor:

Title: Fall-out Distribution
Studies

AFSWP

Departrentof the Arny

Froject Officer:
3.5.1

2.5b

Mr.

Performing /zency:

Wilsey

ORL, Army
Chemical

Center

Objective

The general objectives ofthis project are identical to those
stated for Froject 2. 5a (provide |data 49 the high overpressure regions).
Different types of instrumentation will be employed with suffi-

cient overlap with Project 2.5a to provide for good correlation.
Project 2.5b instrumentation will be largely concentrated on land

areas, plus a number of lagoon raft stations;7within about 15 miles of
the Bikini detonations.
hy ‘

Frocedure

Lo

,
i]
Thirteen islands and nine raft nositions jin the lagoon of
Bikini Atoll will be instrumented with blast registent intermittent
fall-out collectors and a limited number of toteL
ead

3.5.2

Docunentation is planned for all Dikini events.

3.5.3 2emarks
Processing of equipment will be carried out at Elmer?

equipment transhipped to Tare for distribution.

an

Boat and helicopter

support will be required for instrumentation 2nd recovery atland
stations. A crane equipred LCU will be shured with Troject 2.5a for
30