Office, located at FRED.

This office controlled the movement of aircraft

through the use of two-way radio with the aircraft and telephone and radio
circuits with each of the passonger and cargo agents on all the up-atoll

airstrips.

The EAOO knew the precise location and status of each aircraft at

all times and was ina position to give the best feasible service to all customers.
During the operation the long range construction program at Eniwetok
was reviewed and amended to reflect the projected needs of Task Group 7.4
for future test operations in the EPG.

A similar review was conducted of

the unit manning documents of each of the units assigned to the 950th
Test Group (Nuclear) in order that future manning documents would reflect

the experience gained during HARDTACK.

]

The support rendered to Task Group 7.) by other task groups was outs
Standing.

Although the construction program lagged behind schedule prior

to the operation, most of the delays were beyond the control of Task Group
7.5 and all of the essential facilitics were completed prior to the beginning
of the operational phase itself.

The housekeeping support required of the

Army's Task Group 7.2 was entirely adequate in every respect.

i COPIED/u.
| LANL RC
COPIED/DOE
LANL RC

26
Zz
ao

Le

Select target paragraph3