Poop

lasation
Deck - Enclosed

Capatan ensign space

Rape Coil
Meering engine room

Quarters - Enclosed

deck
eily

floor

Crew's ness - benches and tables
Beok
Clerk's recom - deck
Crew's head
Officer's heed
Offieer's bath

Officer's mese
VIP quarters - rugs and chair

Work spaces ~ Enclosed
laboratory - verk tables and floor
Wireless reom - deck
Galley - flecre and werk areas
Odeervation room (Scientifie) ~ sheirs,
work space, deoks
Wheelheuse - deck
Flying bridge
portable canvas cover
Deck grating ~ wood

Upper bridge ~ Exposed
Instrument cover - canvas

Compass cover —~ canva

Radiation Readings ~ SATUMA HARD

Miscellaneous
Engine reom ~ ses suction
Air exhausts inate recon

2.

Reading

wh
0.06

0.05
atrance

)

06 Hatch only)

0.04
0.0%
0.05
0.05
0.04%
0.05
0.05
0.04

0.05
0.05
0.08
0.05
0.06
0.05
0.07

0.08

0.08

0.05
0.04

Probe held alncet in

2200 hours, 25 July 1958:

MI-5 Beta-Gemma Geiger Counter #1146

Dates 7=26-58
Instruments

Background Ashore:

0.06-0.07 uv/e Bete-Camea
All readings cu expeced cuter carface wilese aeted.

/

eomtact with ourface. Bete shield open, Only maximum readings resorded
ever cseh ares cxsnined.

BEST AVAILABLE Co
py

Select target paragraph3