CONTENTS

PAGE

FOREWORD

iil

PREFACE

v

ACKNOWLEDGMENTS

vii

ABSTRACT

ix

ABBREVIATIONS AND ACRONYMS

xvii

CHRONOLOGY OF SIGNIFICANT EVENTS

xxiii

CHAPTER ONE: BACKGROUND
1.1

INTRODUCTION

l

1.2

SELECTION AND EVACUATION OF ENEWETAK ATOLL FOR NUCLEAR TESTING

3

1.3.

ISLANDS IN THE ATOLL

5

1.4

THE TESTING PERIOD

10

1.4.1
1.4.2

10
13

1.5

POST-TESTING PROGRAMS

1.5.1

1.5.2
1.5.3
1.6

Nuclear Tests
Testing Effects on the Islands

15

High Energy Upper Stage (HEUS) Rocket Tests

Pacific Cratering Experiments (PACE)
Mid-Pacific Research Laboratory (MPRL)

PHOTOGRAPHS OF HISTORICAL INTEREST

16

16
19

20

CHAPTER TWO: DOE ROLE
2.1

PRE-CLEANUP EVENTS TO 15 JUNE 1977

33

2.1.1
2.1.2
2.1.3

Introduction
Early Surveys and Reports
Engineering Study, 1972

33
36
36

2.1.5
2.1.6
2.1.7
2.1.8

AEC Task Group Report
Meeting of September 1974
Master Plans
The DEIS and EIS

39
44
45
46

Operations Plan (OPLAN 600-77)
The In-Situ System

50
51

2.1.4

2.1.9

2.1.10
2.1.11
2.2

AEC Surveys, 1971-1973

37

Work Toward Project Approval

47

RESOLUTION OF ISSUES

51

2.2.1
2.2.2
2.2.3
2.2.4
2.2.9

53
34
57
58
65

Ocean Dumping Versus Crater Entombment
Funding Responsibility
Plutonium Versus Total Transuranics
Cleanup Criteria
Priority of Island Cleanup
xi

Select target paragraph3