TABLE B-4-2. COMPARISON WITH ADJACENT STATIONS AFTER DEBRIS CLEARING
After Debris
was removed

0-N-1
(pCi/g)_

Isotope

Before Debris

1-N-1
(pCi/g)

was removed

2-N-1
(pCi/g)

1-N-1
(pCi/g)

241 Am
155Ey
137Cs
60Co

23.2
13.8
18.0
14.0

22.7
11.6
14.8
19.1

21.0
14.3
15.8
31.4

32.2
21.5
17.8
62.3

Isotope

4-8-3
(pCi/g)

5-8-3
(pCi/g)

5-S-4
(pCi/g)

5-S-3
(pCi/g)

241Am

21.0

25.9

22.3

41.3

60Co

24.5

28.8

21.4

37.3

155 Eu
137%Cs

12.3
27.9

15.1
27.4

1-S-1

12.6
19.4

2-S-1

3-S-1

23.7
36.3

2-S-1

Isotope

(pCi/g)

(pCi/g)

(pCi/g)

(pCi/g)

241 4m
159 Eu
137%Cs5
60Co

13.3
8.2
10.3
23.0

21.2
11.1
17.7
34.9

13.5
9.3
11.4
16.9

23.8
14.2
19.3
91.7

TABLE B~-4-3. SOIL DISTURBANCE RESULTS

Pearl 5-N-1 24lAm

5 Dee 77

Conditions

Measurements

(pCi/g)

Change

(96)

Differential
Change

(%)

Average of 3 measurements

20.6

0.0

IMP disturbs road 10 times

19.5

-5.3

3.0

Dozer removes 4" of road

18.9

-8.2

2.9

*Dozer tracks parallel and all
North-South Direction

18.3

“11.1

2.9

15.8

-23.3

12.2

10.5

-49.0

29.7

*Dozer tracks parallel and all

East-West Direction

Dozer tracks disturb soil in
a circular motion

*These dozer tracks are side by side in one direction over the entire surface of the cleared area.

B-4-3

Select target paragraph3