TABLE B-1-1. IMP OPERATOR COMMENTS ON BRUSH
ATTENUATION EXPERIMENTSITES
Stake No.

Operator's Comments

5-8-3

Average 7' brush 2 areas 18' diameter open grass, dead brush in road,
stake under growth
Extra 508.68 sq. ft. of cleared area*

5-S-2

Average 5' high brush, 2 areas clear grass 15' diameter each
Extra 353.25 sq. ft. cleared area

6-S-2

Average 5' high brush numerous open spots, 7 ft2 open areas, access
road 12' wide
Extra 125.2 sq. ft. of clear area

7-N-1

Average 8' high brush, 200 ft.2 clear area
Extra 200 ft2 clear area

6-N-1

Average 8' high brush, center of a 15' wide track instead of a 10' wide track
Extra 313 sq. ft. clear area

S-N-1

Average 10° high brush

6-S-1

Average 6' high brush, 5 ft. high pile of dirt and brush 12' SSE of stake

4-N-1

Average 10° brush

4-S-3

Average 10' brush dense no opening

7-S-1

Average 6' high brush

*Underlined comments were added by the author.
TABLE B-1-2, EFFECT OF CLEAR AREA IN PERCENT

Stake No.
5-S-2
6-S-2
1-N-1
6-N-1
5-N-1
6-S-1
4-N-1
4-S-3
7-S-1

Open Area, ft2
353
125
200
313
0
0
0
0
0

B-1-4

Area

3691 7 Percent

0.049
0.054
0.055
0.086
0.0
0.0
0.0
0.0
0.0

Select target paragraph3