OR

fF BEAL A/S)

Add AE PLE

Wasted VY

LLG *eVOULLA LELaALCS

on the subject of the future of nuclear cloud sampling.

LO @

urip to

AOL

The conctusions were

"The B-57 type aircraft can adequately take care of LASL sampling requirements

for surface shots within the immediate future.
are required fora dual shot capability.

A minimum of 16 of these

Modernization to another type

aircraft should be programmed for as soon as possible.

LASL should be

advised as to the replacement aircraft for the B-57 in order that sampling

We should: plan for support of LASL in development of an air launch sarnopling |
rocket-system.
LASL will provide us.with a statement of requirement for supporting an

air launch sampling rocket system.
LASL will provide us with a statement of future requirements for manned
aircraft sampling support.

This will probably cover the time period 1961

to 1965 or the ''foreseeable future".

As for recommendations, Col. . Kidd says that if the consolidated (LASL
and Livermore) Laboratory requirements for sampling support do. not

specify six B-57D's,we should cancel our request to AIDC for this model
and request the 4926th we augmented by B-57B's.
was in line with the fact that Dr.

This recommendation

Cowan at LASL did not feel that the

D's were necded as Livermore had requested.

I believe this requirement

for the D was justificd soon hereafter by a requirement for the additional
altitude capability.

sana

equipment may be developed.

Select target paragraph3