TOPSECRET se O prot trie latter alternative, theémergency capability. program will be @iven sufficient flexibility to permit. such a_cholee after CASPLE, Pre-eminens among the factors which have led to the adop- tion of this schedule are the follewing: 1. The sonstriction pregram at Emiwetok would require joint occupancy of test structures by the contractor and by scicntific persennel for at leas*s two weeks hefore snot date iv an earlier schedule were to be attempted. Buch joint occupancy (e.8. Wiring going in by the contractor at the same time electronic equipment is being tested by seientifie personnel) is believed to be completely impractical, From a security point of view, it i8s most undesirable. .to have construction workmen present during weapon assembly and placement opevaticns, The proposed schedule eliminates (or minimizes) such joint occupancy. 2, Tha supply of 146 for the es inesec experiments should BS Complete faveoueing vo bresent predictions) for the pro- posed ¢scheduie at least 50 days in advance of actual shot date, Approximately 40 days is regarded as minimal time for shipment, fabrication, local assembly anctest, overseas shipment by air, and assembiy and test overseas. The proposed scheduie allows 4 slight. degree of freedom in this wespect, 3. The proposed schedule will permit the Task Force to send the major portion of its pergcnnel overseas immediate- iy afte: Christmas rather than sometime before, This is a matter of some concern to the Task Forca Commander for obvieus reasons of morale, It will also permit a considerabis degree of logistic simplification, particularly with regard Enclosure "B"

Select target paragraph3