—..

HO ntpe
a. ET.

yosratl

wy

at Kwajalein for flight following.

Two (2) weather missions each day, of approximately twelve
(22) hours duration, commencing on first shot day minus
twenty (20) days.
ee

Three (3) weather missions each day , of approximately
twelve (12) hours duration, commencing on first shot day

minus four (4) days.
f.

Post-shot missions, combining weather reconnaissance and
observations in connection with radiological safety of two

(2) missions each day of approximately twelve (12) hours
duration on shot day through shot plus two (2) days.
2.

Conduct sampling missions for AFOAT-1.

(Project 7.3)

3.

Conduct long-range cloud tracking missions after each detonation
for radiological safety purposes up to a radius of 1,000 nautical

miles in the significant quadrant for a period of forty-eight
(48) hours after detonation.
4.

Beginning 10 October 1952, assume typhoon reconnaissance

responsibility in the area bounded by the equator, latitude 25°R,

longitude 157°, 30'E and the meridian of 180°.

BEST AVAILABLE cop

y

Select target paragraph3