«a
§
wc
J~3 DAILY DIARY
Bikini Atoll)
J3=DDH-BS9
.
1, COMMUNICATIONS:
17 May 1958
Tt x
CO,
a. The 1545M NUTMEG Signal Dry Ran (30 mimte script) for the purpose of
checking cut the cable connections to the barge on site was cancelled
at H-40 minutes (1505M) due to the fact that the HAN people had not
completed their cable splicing and hookup,
It was estimated that they
would require at least 1 1/2 hours more (1715M) before hookup would be
completed,
To make up for this deficiency, three signal dry runs have
been scheduled for tomorrow (Sunday),
(ROS)
-
2, EVACUATION AND RE-ENTRY:
a.
3.
Rad-Safe Map for HIKINI Atoll for F+5 is attached as Inclosure #1,
SHOTS:
a.
(DHC)
*
Movement of classified material (NUTMEG) from aircraft to Assembly Build.
ing was completed at 1345M without incident, (WIM)
1 Incl:
Rad-Safe Map - F+5
DISTRIBUTION:
ucke)
2 - J-3 ENIWETOK (Lry
(Ave )
1 = J-3
RG
TOE EGY
8°G 0% ae
my tn
el5 l
ain FA
to.
Re
[
wcat en
Ge
oR
and
7
baile
-77a3, 947°
,
relies Jed BIKIMDAILY DIARY
Gita
ae
CON
—~"
-
ee
cee
‘_
a —_
BEST COPY AVAILABLE
|
COPIED/DOE
LANL RC
CONFIRMED TO
BE UNCLASSIFI
ED
BY AUTHORIT
Y OF DOE/oc