«a

§

wc

J~3 DAILY DIARY
Bikini Atoll)
J3=DDH-BS9

.

1, COMMUNICATIONS:

17 May 1958

Tt x
CO,

a. The 1545M NUTMEG Signal Dry Ran (30 mimte script) for the purpose of
checking cut the cable connections to the barge on site was cancelled

at H-40 minutes (1505M) due to the fact that the HAN people had not
completed their cable splicing and hookup,

It was estimated that they

would require at least 1 1/2 hours more (1715M) before hookup would be
completed,

To make up for this deficiency, three signal dry runs have

been scheduled for tomorrow (Sunday),

(ROS)

-

2, EVACUATION AND RE-ENTRY:
a.
3.

Rad-Safe Map for HIKINI Atoll for F+5 is attached as Inclosure #1,

SHOTS:

a.

(DHC)
*

Movement of classified material (NUTMEG) from aircraft to Assembly Build.
ing was completed at 1345M without incident, (WIM)

1 Incl:

Rad-Safe Map - F+5

DISTRIBUTION:

ucke)
2 - J-3 ENIWETOK (Lry
(Ave )
1 = J-3
RG

TOE EGY
8°G 0% ae
my tn
el5 l
ain FA

to.

Re
[

wcat en

Ge

oR

and

7

baile

-77a3, 947°

,

relies Jed BIKIMDAILY DIARY
Gita

ae

CON

—~"

-

ee

cee

‘_

a —_

BEST COPY AVAILABLE

|

COPIED/DOE

LANL RC

CONFIRMED TO
BE UNCLASSIFI
ED
BY AUTHORIT
Y OF DOE/oc

Select target paragraph3