Cc.

Orafe Resere

in A above. This report should tnuclude the results of all ec @ Tesearch and
any findings. Submission of this draft report should mark ¢ e comletion
comments and preparacion of che final reporc. The DOT shallihave two (2)
weeks ta respond to the draft resort. IF the contractor doe
teply or a requese for an extension of time within two (2) w
contractor say assume the content of the draft report is ace ptable. The
DOI may, ac its option, request a meeting with the contracto to discuss
the draft report during the two (2) week review period.

‘Delivery:
De.

Six (6)

weeks after contract award.

Final Reporte

After receipt of the departmenc’s comment on the draft repo , the contractor
shall prepare and submit the final report to the Department
six copiles
as indicated in A above. The Departzenc will have two (2) v ks to review
the final: report and itadicaced to the contractor its accepts lity or atnaor
reply from
modifications required.
If che contractor does noe receive
the Department within two (2) weeks, the contractor say pres e che fircal
report is acceptable.
After acceptance or minor nodificarito
ef the final
report, the concractor shall prepare and submit thircy (30)
pies of the
1l de sence
final report and a reproducible copy to che COTR. One copy
to the Branch of Contracts.

Initial Delivery:

Seven (7)

weeks after contract av

Final Delivery:

Eighe (8)

weeks after contract award

E.

Briefings

At a time to be arranged by che COTR, but no esrlier than th twenty firse
week of che contract, th= contractor shall arrange ta have k
scaff,
consultants and subcontractors in attendance at a seeting at he Departsent
signments
of che Interior, sashington, D.C., to present their specific
and areas af speciality and the answer to questions on Wester nh coal industry
from Department versonnel.
Article ¥ = Period of Perforzance

The contractual pertod of performance shall be for

two = from the date

of the contract award.

Article VI - Gowernment's Estimate of Workload
The Governusent estimates workload for this proposed project ¢ [ be fortymetgne

pan~ronths.

13