Article IV = Deliverables
A.

Letter Progess Reocrts

The coneractcr shall prepare and submit two letter progress
exceed five pages in length. Each of these reports shall:
1.
eenpletion.

Ideneify praject status, including an escimatioh

ports net to
of percentage

2. Report expenditures in period of repore and cumglatively and
explain deviations from estimated expenditure levels; and
3. Summarize work performed; accomplishments; and g@roblezs
encouttered during period of teport; plans for succeeding pergod; and
aceions requested for the Departzene of the Interior.
Tnesa reports shall be submitted six (45) copies, five to the
neracting
Officer's Technical Representative (COTR) and one to the Bran h of Coatracts.
Belivery:

‘EB.

Soe later than the

4th week and the 5th week of th@

contrac.

Detailed Work Plan

on the
After gathering and assinilacing relevane available inferuste!
subfece of this work effort, the contractor shall prepare 2a d alled sentence
sartaenc of
eutline of the final repore. This shall be submicted to the
the Interfor for review and commence in six (6) copies as fadic ted ina
above. The COTR will reply by approving or recommending sodifficacions to
the outifine wichin two (2) weeks of its receipe.
If necessary] the COT? way
request a neeting wich key contractor personnel during the twofweek serioc
ta discuss che proposed detailed outline.

Uelivery:

Three weeks after contract award.