Sof
Two budget items require special comment, training and
tion.

mew construc-

A major concern throughout the development of the progwam has been

providing for the training of individuals so the Marshall Is]

ds in time

can use more and more of their own people.

may appear

For this reason i

to be an over-budgeted item but in part is cost effective and

ulturally

desirable.

The other item, construction, is a result of the fact t

t from a

practical point of view, housing is going to have to be provi

d to the

Medical Assistant/Health Assistant on the atolls. There is 13

le avail-

able housing and in one instance they had to leave an atoll b

ause of

this.

It becomes a major budget item in years two thru five

this re-

presents the timing for individuals coming off training progr
C.

Secondary/Tertiary Care
As with any health delivery system, costs for this level of care are

the highest single component of the system.

Contributing to

e cost are

the short useful life of equipment and maintenance costs beca

e of the

hostile environment (climate).

roved main-

It is anticipated that with i

tenance the average useful life of most equipment will be thr

to four

years.
As discussed in the previous section, training and upgr

ing of per-

sonnel is something that must be included early in the progra

We have not budgeted for any major renovation of the Maj ro Hospital,
as it appears that a new one will be built.

Since it seems t

be beyond

the scope of this study and there are funds already available

or this new

hospital, it was not included in this budget.

nae and a

Should plans c

new hospital not be built, this could bea major addition to t
health care delivery system.

cost of the

Select target paragraph3