—_
1
~
ate
rel]
LOISTI SURE
The Northern Mareha’.i
Teland Surver wil
phases--the photccrapriic eutvey ard
The Navy Project Manager
Tesponsibilities fer
commander, Facif .c
will be accompiiahe?
ra
iy
acccers te this survey is
“+
i
elever “''
Magu, California.
#'- "8 and two (2) islands
9:
anrerifical Tose at. cored
.nfra-re
ta pate
Radirlogieal Survey.
and execution of Nod
us ilizicg a Tenartmes*
vee
high resolution anc
Aer'al
ctoerdtina:'.or
Mi set. “ear
:
~~ conducted in two separate
rie
resdering losis’
The photographic aur e
The platform has
tor
“Tas traM
(scerae
Naww EC-121 aircraft.
se
receive DOE-provided
¢lue additional
peripheral guopert ersiomec’
The aircraft wi
*
lone
taged
to fly i0-.2 ho
ve
tev for
contingencies
tor
>
weavhe
Utilizing cata gathere:
arn Aerial Raddcoliogi
a.
and islands by meac« 7"
matin *
Wyety
gnd will
4
8
arn seeing
acd ai: grate
fron
ct
This
docludes
sry + dme
the Foreccc~,
toa
Survey wi
dave
be required
ohotographic sutvey,
ms yorec of the same atolle
twe SH-?7 met
ers ecquinped with DOE-
provided radiation ferertien arc reco“
sg
dnscrmmentation.
helicopters wii’
on,
U'SN3 WREEELING, a base
«crmal’y operat ew
support ship whicm wil.
form
tr add’ "0
suppert for the te reat<dal ane
~e-wtde
The
a wide cange eof logistic
Marine “+ oerams.