|Beat nnsece
en
rns Archives
Pacific Souflewest Region:
“OEOLASSIPIED BER DOB
| BOs 96, Rev. 3
LEVER OATED GULY, 15, 1994
— Page 2
PROD
ANTON SINISGALL TO
DEANS S. NIXON
‘Move the latrine fram the barracks batlding to the day room and provide°
he 2a shed for laundry facilities,
weather stations in’
These instructions supersede the designrequirementsisfor
stil to be sinilar to
-_papagraph 3 of JTF-7 letter. The had-Safe Station
__ theNotho Station.
. | pattielent ‘to carry the additional load of the ice making machine and elects
“gr
requested in paragraph 7 of JTF-7 letter,
_Pequired make provisions in your estimate,
.1957IN| REGARD 0.weir AND RAD~SAFE STATIONS,
Fred W..Hohner
|
S, P. Howell
ABG Contract Representative
Project, Manager
If larger generators are .
DUE TO MISINTERPRETATION oF
|
En we
..,, Engineering
a JeonJoe B Sanders, AEC
ce. ABD Contract Representative
Project Manager-942
.
. Operations Division (2).
ee
Se
oe
&:
a
Chief Design Ingineer
~._ Ass't Controller-942
P, L, Atkins
Chief Estimator (2)
HEN Resident Manager, 0/S (2)
,
C, W. Embree
G. KE Daverin
H&N Resident Ingineer, 0/8 (3)
V. M. Farel
Re R. Alvy
FP. D. Bates
EK R Berrien
R. Re Gunny (2)
H. C. Hale
M. Roberts
B. R, Coupland
Central Files
H&N Resident Controller, 0/S
Be J. Chorney
T. W. Galvin (2)
E. L. Milew
O@PELCI“AE
USE
GHELE
HO. 98, Rev. 3
ae