Angad a S \NDARE FORM NO, 64 a x 4, : . Office Memorandum + onitED sTATES GOVERNMENT TO : Brig. General Alfred D. Starbird, USA sane DOE DATE: Director ofre Application, AEC, Washington, D. C. FROM : yank’E. ciel heat ctor,Test Division, Albuquerque SUBJECT: OFF ATOLL SITcS - ENIWETOK PROVING GROUND SYMBOL: ETP:EW=2855 Operations Office, AEC, Albuquerque Mr. W. P. Risso, of your office, has requested some background and detailed information concerning site improvement, operation, and costs of the environ sites of EPG developed for REDWING. The first requirement for additional weather stations was launched with a reconnaissance survey in June of 1955. JTF-SEVEN funded the construction (accomplished by AEC-Holmes & Narver, Ine. ) Air Weather Service operated the four sites. Holmes & Narver performed recurring maintenance and assisted in rollup at the end of the operation. Force). Resupply was performed by TG 7.4 ( Air Food was provided by TG 7.2 (Army). The stations were located at Tarawa, Kzpingamarengi, Kusaie, and Rongerik. At Kusaie and Rongerik, the AWS-operated mess supported scientific and JTF-SiVEN Fallout Prediction Unit elements. Scientific stations and elements were located on Kusaie, Rongerik, Wotho, and Ujeland. JTF-SEVEN established Fallout Prediction Units ” (FOPU) on Kusale, Rongerik, Wotho, and Utirik. Funding for construction was negotiated between the participating elements on a percentage-of-interest basis. The pro-rata being established by percentages reflected in the original estimates for construction. Operation of supporting camps was by H&N with reimbursement comparable to the EPG standard charge of $1.50 per day with overruns being absorbed in the general operation and maintenance accounts. Concurrence with the general plans for construction, operation, and costing was worked out at the operating levels of ALOO and CJTF-SEVEN, and it is believed DMA was kept informed of progress in these negotiations. Under the ALO broad interpretation of subparagraph (e) from DdA's CMe nebpanee FY 1959 Detailed Program Assumptions ~ Weapons cones TO BECote AUTHORITY: DOE/SA-20 BY eN SCHMIDT, DATE: ‘ Sify | (continued) MILITARY RESEARCH & APPL 7 | £6

Select target paragraph3