lh.

The initial helicopter radietion surviy shmved redistion

recdings on the islands of BIKINI Atoll to be negligible.

32s5eon

the initial surveys, reentry hour was estimated es 1030N, 21 May

(Hey hours),

S.

All RADEX notices were withdrarm by H+12 hours.

The Off-Atell Nonitoring

Stetions (TA3 G) weno: tc? atl

intensities no higher than backgrceund through CHEUUNSE plus tree ¢y-s.

6,

The fallout forecast for CHERCEES

(TA3 B) was bes2- on th:

ard

thit fuse malfunction vould result in a scurfeee bazst of th

m

zecumption that

“ONO.

Secety considerations dictated the use of thes? two assurnptio s.
Aecsially, the most protable pattern was expect2d to be less ten

1/1000 of the precict2d pattern.

The meesured fallv:t es indicated

previasly was negligible.

-~-

|

GOPY
BEST AVAILABLE

Select target paragraph3