HISTORIC AL:
At the completion of Operation Sandstone the Los Alamos Scientific

Laboratory established within its organization a permanent division for
the testing of atomic weapons.

This is known as J-Division.

Soon after

the establishment of J-Division recommendations were made to the Manager,
Santa Fe Operations Office for the AEC to establish somewhat permanent testing and operational facilities at Eniwetok in order to greatly minimize the
effort and cost involved in conducting repeated tests of this nature.

J-

Division also recommended at this time that a civilian engineering-construction firm be utilized for the principal construction program involved in the
establishment of the proving ground facilities.
Accordingly, a contract was entered into between the AKC and the engin-

eering firm of Holmes and Narver, Los Angeles, California to conduct an engineering survey of the requirements for the semi-permanent facilities at Eniwetok.

The report of this study, entitled "Report on Reconnaissance, Planning, Utilities and Structures at Proving Grounds, Eniwetok Atoll for Atomic Energy

Commission” and submitted 7 January 1949, served as a basis for a comprehensive study and planning program on the part of J-Division.

be referred to herein as the "Reconnaissance Report",

This Report will

From this study the

division recommended to the AEC an operational plan with detailed construction requirements which were believed to represent the most satisfactory and

economical means for conducting repeated tests at the South Pacific site.
It should be pointed out that the subject of a continental site for
atomic weapon testing was thoroughly considered at this time and the decision
was made by the Commission that no satisfactory site was currently available,

el DI