shown in Plate 1).

Administration and Laboratory Buildings.
administrative buildings are appended:

Floor plans of the following

Scientists' Administration Build-

ing, Plate 16, Holmes & Narver Administration Building, Plate 15, Photo
Laboratory, Plate 18, Instrument Laboratory and Repair Shop, Plate 17, Count-

ing and Sample Laboratories, Plate 19, Radsafe Building plan has not been
finally approved as of this date but this will provide for the handling of
instruments used in checking radiological safety and clothing worn by the
monitors.

All laboratory buildings will be air conditioned to the extent of

reducing reletive humidity only except the Photo Laboratory where temperature

of 70° with 50% relative humidity is required.
Other Buildings.

The Infirmary, Plate 9, is planned to handle emergency

surgical or accident cases.

Included in this facility are the following:

(a)

Six bed ward

(>)

Small laboratory for usual blood tests, and biochemistry

(c)

Surgery with portable X-Ray and dark room

(d)

Small diet kitchen

(e)

Dental office for emergency work

(f£)

“Nurses! living quarters

Mess Hall, Plate 8, and Post Exchange, Plate 11, are placed between
Scientists' and Holmes & Narver quarters to reduce cross traffic but sufficiently isolated to avoid Mess Hall noises and odors in the quarters.
In the first stage of construction one dining wing of the Mess Hall will
be omitted and the end of dining wing temporarily closed in such manner that
the missing wing can be built during the second stage of construction without interruption of Mess Hall service and without changes in first stage
construction.

The Mess Hall is planned for "family style" service at the

16.

Select target paragraph3