Commander's Concept of Operations

CJTF SEVEN No. 1-53

and equipment not involved in recovery operations for the shot will
be deployed from BIKINI ATOLL. Total pre-shot evacuation of all re-

maining personnel and equipment (less firing party) will then be
necessary during the shot. Data recovery operations will be conducted

from afloat. Upon completion of data recovery operations, the task
force afloat will return to ENIWETOK ATOLL and move ashore to conduct

Shot #5 (ECHO).

(4) SHOT #5 (ECHO) and SHOT #6 (YANKEE).

There will be no pre-

shot evacuation of personnel or materiel from ENIWETOK ATOLL for these
shots. Only the transfer of personnel, equipment and small craft from
the northern islands to ENIWETOK and PARRY ISLANDS will be necessary.
ce The foregoing pre~-shot evacuation procedures will apply to all
task force personnel except a firing party of approximately six (6)

individuals who will detonate the BIKINI shots from a protective bunk-

er on ENYU ISLAND.

d. Except for Shot #4 (KOON), it will not be necessary to evacuate
any land~based materiel beyond the limits of BIKINI ATOLL for protective purposese
e. Emergency Post-Shot Evacuation Capability. During those shots
where a pre-shot evacuation is not conducted, the joint task force
will maintain a capability for emergency post~shot evacuation. An

emergency post-shot evacuation will be executed only if unexpected
radiological conditions so dictate.

Such evacuation will be for per-

sonnel safety only; will not involve movement of materiel or personal

belongings other than toilet articles and; will be capable of accom-

ro?

plishment on four (4) hour notice.

Po We CLARKSON

Major General, U.S. Army
Camnander
Appendices:

I ~ Map of ENIWETOK ATOLL
II ~ Map of BIKINI ATOLL
DISTRIBUTION:
CTG 7el
CTG 7.2

1 copy
1 copy

CTG Tek

1 copy

CTG 7.3

CTG 765

1 copy

1 copy

Assistant Chief of

Staff, J-3
B-8