CHAPTER II, SECTION TA
For second order triangulation surveys, the
allowable discrepancy in the length of any line
of the scheme cannot exceed 1:10,000 and for
third order 1:5,000. The base line, from which
a second order survey expands, can have a
probable error of not to exceed 1:500,000.
PREVIOUS SURVEYS. The available records
of earlier surveys of Bikini Atoll consist of Chart
No. 6032 published in 1944 by the U.S. Hydrographic Office, and the adjusted data of third
order surveys completed in 1946 by the USS
Sumner and USS Bowditch. A geortetic report
on the preparation of the chart and adjustmen:
of the 1946 surveys was obtained from the U.S.
Hydrographic Office.
U.S. Hydrographic Office chart, No. 6032,
as prepared in 1944 and with only minor changes
in the later editions. is stated to be a photo tranfer of Japanese Chart No. 4538. Although records
of hydrographic and geodetic surveys, made by
the Japanese in 1919, were obtained bythe U.S.
Hydrographic Office, aone of these surveys were
recovered. The datum of all charting in the area
was based on a scaled value from the Japanese
Chart and this value was adopted for the

Secondary stations were established at locations

of lesser importance by expansion from the primary net and by local triangulation at project
areas. The permanencyof the station marks was
considered in locating the stations, and all
stations were referenced with the exception of a
station located on a coral pinnacle in the lagoon.
References independentof the station structure
could not be established for this station.
Standard procedure and specifications of
the U.S. Coast and Geodetic Survey for second
order triangulation were carefully followed in
executing the survey. The geometry of the
scherie was strengthened by construction of a
station in the lagoon which became the hub of
the network and resulted in all figures being
well above minimum strength.

DISTRIBUTION OF CONTROL POINTS. The

scheme consisted of ten primary statioas established to second order specifications, nine of
which were on the perimeter of the lagoon and
the tenth was the lagoon station. Figure 2-4

origin of surveys in the area.

The 1946 survey by the USS Sumner and
the USS Bowditch consisted of two surveys
expanding from independent base lines and
covering the eastern portion of the atoll. Three
triangulation stations were common to both
surveys, permitting consolidation of the surveys
bs a least square adjustment. The apparent
purpose of the surveys was to establish the interrelation ot Scientific Stations which were
used in OPERATION CROSSROADS.

t

:
‘

As the scheme was stated to be of third
order accuracy and the geometry of the scheme
was not consistant with requirements of CASTLE, it was noi considered practical to expand
from these surveys. Most of the stations of these
surveys were recovered and their relation to the
new second order network determined. They
were also used for preliminary location and
orientation of island traverses furnishing basic
information for design of project features.

SUMMARY OF GENERAL FEATURES
OUTLINE OF SCHEME. A triangulation network encompassing the Atoll was established by
expanding through a series of check figures from
a base line on the south perimeter of the Atoll.
The base line extended from Oboe to Sugar. The
survey was for purposes of coordinating local
surveys on the project islands and determining
the interrelation of the various project areas.
The scheme was designed to provide horizontal! control throughout the Atoll, with primary
stations established where necessary to meet
project requirements and consistent with the

geometneal specifications for strength of figures.

Figure 2-4.

Survey Tower, Site Able

shows a typical survey tower, located on site
Able. Seven additional stations were established
to third order specifications. Six stations of

the earlier USN Surveys were incorporated into
Page 2-2}