APPENDIX A

Contract AT(29-2)-20
Joint Task Force 7 Cost Report - (FINAI
Cumulative to June 36, 1954 - Installs

OPERATING COSTS
Cost
Code
No.
(A)

Function

Supphes &
Materials
(C)

Pavroll
(B)

Other
Costs
(D)

Consumedin
Operation
(E)

Total
Oper, Cost
(PICCOCDICE)
(F)

SCIENTIFIC PROGRAMS
Prog. 11
11.1
11.2

S$

646

IF5

11.3

1.230

Total Program 11!
Prog. 12

12.1
12.2
12.3
Total Program 12

Prog. 13
13.1
13.2
13.3

Tuial Progeans 13

1,013

3,62]

5.370
224
1421
7.015

4

9,726
417
2.637
12,786

L102 287
POL, 77
445,206
1.649.272

LET 3s
102 40
449,547
1.669,354

2.828
151
1,062

166,579
166,579
166,581

170.913
166,806
168,291

347

797,980

798,534

Uso
vst

2

86

83

8 agg

2s

we beste

237
7
317
93
41

16,951
&29
612
16,592

6

na
on

F9L
Wh

Prog. 17
17.1

2,977

967

207

Prog. 16
16.1

x

4,198

14.1

Total Program 15

2 253

967

315

Prog. 14

Prog. 15
15.1
15,2
15.99.6

3

mS]

2,131

18.846

13.5

3 1.564

177

138

1,504
76
648

13.4

13.99.6

3

3

‘

34,004

539,692

193

QS.585Leary

5,105

;

30,987
1.654
1,236
33,877

592,628
27

YSOT 418

17,600

25,650 |

278,422
59,071
331,493

323,367
61871
19
387,179

34
$107

7.611

53K

$=

«3.532 $3,693 ©
Page A-5