CHAPTER Ill, SECTIONS 2 and 3
ACCOUNTS PAYABLE. Personnel in this Section processed and were responsible for paying
all accounts pavable and travel expense items,
with the exception of employees’ travel expenses for journeying to Jobsite under Employment Agreements. The policies and procedures
followed were predicated upon the experience
gained under prior operations, and compled
with the requirements of the Commission's General Accounting Office in the post-audit of expenditure of Governinent Funds.
Inasmuch as most purchases were shipped

by the vendor to Oakland, California, for trans-

shipment or repackaging and transshipment, it

was mandatory that recetving reports from the

packer be received promptly to insure recovery
of cash discounts. When materials arrived in
Oakiand, receiving reports were immediately prepared hy the packer and transmitted io the
Accounts Payable Section for processing and
payment of vendors’ invoices. From 1 January
1953 through 2

Mav

1954,

this Section pro-

cessed and paid vendor invoices totaling approximately $14,782.U00 (after deductions of
discounts in excess of 65,900).

The procedures and methods used in processing per diem and travel expense payments
were in accordance with established Company
policy and complied with the provisions and
requirements of Appendix “B” of the Contract.
From the effective date of Operation CASTLE
(1 January 1953) through 2 May 1944, a total
of 3257 Travel Orders were processed covering
single

and

multiple

movement

of

personnel.

Travel expenses in the approximate amount of
$290,000 were processed and paid through both
the Home and Jobsite offices. A totat of 18,407
checks were processed during the period for payment of travel expenses and vendors’ invoices.
PROPERTY. Functions of Property and Materials Section were carefully synchronized with
receiving and warchancing anerations, Changes
in Jobsite or Home Office receiving and warehousing procedures were drafted in concurrence

with property and material accounting procedures in order that adequate accounting controls could be maintained at all times, and

vendors’ invoices wete processed in the same
manner as detailed under “Accounts Payable.
For items in transit to overseas locations,
accounting control was maintained through the
“Inventory in Transit” Accounts, and upon receipt at Eniwetok, these items were cleared
from the in-transit accounts by appropriately

charging them to either the proper warehouse

inventory account, or to the work order number
applicable to the particular feature of work.
While recording equipment to the in-transit
account, equipment record cards were prepared
and tiled in a suspense fite. On receipt of the
Jobsice monthly report listing additions to and
retirements from the account, tne equipment
cards at the Home Office were reconciled accordingly. Periodically, complete inventory equipment listings originated at the project site

were veconciled with Home Office equipment
records. Copies of the monthly listings to and
retirements from equipment iuventories, the periodic complete iisting of equipment perpetual
inventory, and the periodic physical inventories

were required by the Commission. Copies of all

invoices were furnished the overseas Property
and Materials Accounting Section for their use
in pricing and clearing from the “inventory in
Transit” Accounts all items received and transferred to work in progress or warehouse inventories.
Receipt of materials at Emwetok Atoll was
consistently good. Practically all adjustments
of claims against vendors and on-continent car-

riers, resulting from over and under shipments
or damage in transit, were accomplished in a
satisfactory manner.

Matericls and equipment expended at the
PPG by loss, destruction, or normal wear and

tear, were cleared from accountability records

by means of survey reports which contained full
information as to the circumstances under which
the items were expended. These reports supportcd inventory adjustments and entries on retirement work orders as appropriate. Other reports
covered specific items such as motor vehicles.
machinetools, and excess and personnel property.

SECTION 3
ESTIMATING
In addition to the Home Office Estim: ting

organization, a supplemental estimating xroup
was established at the Pacifie Proving Ground

to assemble cost estimate on basic field des:gns.
The Home Office group comprised an avi rage
of three civil and or arcnitectural engireers,
three structural engineers, two clectrical « ngiPage 3-8

neers, two mechanical engineers, two. statisticians and four clerks, all of whom functioned
under the supervision of the Chief Estimator
and the Assistant Chief Estimator. The field
estimating group was comprised of personnel
in the Jobsite Engineering Department, and
included two experienced cost estimators, one

Select target paragraph3