CHAPTER II, SECTION 6

ee

8

Figure 2-217.

Causeway Location - Able to Delta
first opened, until heavy construction started
and traffic to and from the batch plant on
Eas‘ increased materially, single-lane roads were
adequate. In August 1953 approval was obtained
to widen these causeways to a minimum of 25
feet and to raise the elevation to plus 8.5 feet
in order to minitnize washouts at high tide.
This latter work was accomplished on a fill-in
basis, involving the least possible interference
with the Scientific Program.

ABLE - DELTA CAUSEWAY
GENERAL. Shortly after site Charlie was selected for the Bravo experiment, a requirement
developed for a camera bunker location 7500
feet distant from Station 20 at the end of the

Soe ET
=

~

7

we
~

_

—

-

7

a
-

~
~

L-

~~

Figure 2-219.

‘f‘emporary Camp at Able

Page 2-218

weet

L

ta = Lema Tee oe

2 aanln a

Select target paragraph3