CHAPTER tI, SECTION 6

Figure 2-209.

Causeway - Sugar to Tare

Peter to Roger - Approximate length 3000 feet.
Roger to Sugar - Approximate length 1000feet.
Available bank and reef coral was used, the
surface being traffic compacted and stabilized
with sea water. From May 1953, when first
opened, until heavy construction started and
traffic to and from the batch plant on Oboe increased materially, single-lane roads were adequate. In August 1953 approval was obtained
to widen these causeways to provide for a 25-

foot road and toraise the elevation to plus 8.5
feet in order to minimize washouts at h‘ch tide.
Final completion was on 5 September 19-3.

CONTRACT ITEM NUMBER A-26-26.1
CAUSEWAYS TARE AND CHARLIE
GENERAL. In March 1953 it was established
that causeways would be required on sites
Charlie and Tare for the vacuum pipe arrays
to be used in connection with experiment; at
those sites. Straight lines 7500 and 5600 fe-c in
length respectively, were necessary, conne:'ting
the Scientific Stations at their ends. By suit-

ably locating the Scientific Stations involved,

it was possible to obtain these pipeline lergths
with the construction of a causeway app -oxi-

mately 3000 feet long extending westward from
site Charlie, and a causeway 1100 feet !ong joining sites Sugar and Tare - Figure 2-209. The
Charlie causeway included at its end an island
approximately 0.8 acres in area at elevation plus
10.0 feet on which were located Stations 20, 1110,
1202, 1351, 1560.02, 1812.01 and a number of
scientific tents and trailers. Both causeways were
also used as access roads.
The Charlie causewaylocation and approved borrow areas are shown on Figure 2-211.

ENGINEERING. Criteria for location of the

pipelines and pipeline causeways were finalized
in the Home Office early in March 1953. The
location selected for the Tare pipeline and causeway was reviewed and checked by Field Engineering, insofar as possible conflict with the de-

velopment of Tare campfacilities was concerned.

Drawings showing the plan and profile of both
causeways were approved in May 1953. Field
Engineering processed the necessary work orders, surveys and inspection of construction.

CONSTRUCTION - CHARLIE CAUSEWAY.

This causeway was 87 feet wide at an elevation
of plus 9.0, and was lt ulkheaded on the lagoon
Page 2-209

“

8 news PantitheOE
Sicla,
cand

Select target paragraph3