CHAPTER II, SECTION 5 Figure 2-168. Station 2400.02 - Aerial View of Completed Structure ENGINEERING. Criteria were recvived on 25 Novemher. Design work was started on 25 November. Two drawings were prepared and Figure 2-166 shows the Station us 98% completed on 19 December. This figure shows the relation between Stations 2400.01, 2210 and the pipe array. submitted on 7 and 11 December. Approvals STATION 2400.02 LIMONITE COLLIMATOR STATION ON UCRL PIPE SITE SALLY - USER: UCRL CONSTRUCTION. Work was scheduled to commence on 1 December and to be completed by 20 January. Actual construction started on 6 January and was completed on 26 January. BRARASA STATIONS GENERAL. Similar to Station 2400.01 with WR pe ea ENGINEERING. 2400.01. Reported under Statior CONSTRUCTION. Work was scheduled to start on 15 September and to be completed by 15 January. Actual work started on 17 Septem. ber and was completed on 2 January 1954. Figure 2-167 shows the Station as 85% completed on 15 October. Figure 2-168 shows Station completed with earth fill as of 10 April 1954. STATION 7400 RADIO BEACON SHELTER AND ANTENNA SITE NAN - USER: TG 7.4 GENERAL. The Station consisted of 11’- 0” x 13’- 0” x 9°-0" high wood-framed, plywood covered building. Normal lighting and receptacle outlets were provided. An emergency power source was provided with an automatic transfi'r switch. ; were received on 17 and on 29 December. CONTRACT ITEM A-27 SUPPORT FACILITIES FOR SCIENTIFIC " Under expendable items on Contract Item No. A-27 were included items other than Scientific Stations. Among these items were the Assembly Area and its structures and facilities en site Elmer, a small temporary camp on site Able, general site work and temporary power at all sites, Scientific Power Plants, modifications to structures and facilities in the CMR Area site Elmer, clearance of CROSSROADS structures as requirea at sites George and Nan, pylon range markers and electrical Sub-stations for Scientific Stations. The more important of these items are reported on pages numbered 2-198 to 2-206 inclusive. Pages 2-142 through 2-188 note the geographic Iecation of all Scientific Stations constructed for OPERATION CASTLE on both atolls, Page 2-149 +0eee