Figure 2-148.

tying into old reinforcements. When the pour

was made, tying into the old concrete and re-

inforcements, a yardage of approximately 290
cubic vards was involved. In the middle of this
pour 4 severe rainstorm of over an hours duration vas experienced. The concrete in place was
calvagerdd All larce subsequent pours were carefully scheduled on weather predictions. Figure

2-150 notes an estimated 45°, completion as of

15 October. Figure 2-151 shows Station complcted with User's trailers in operation as of 10 April
1954.

STATION 2210 - DETECTOR STATION
SITE “UGAR - USER: UCRL
GENERAL. TheStation, used for reaction history, was a steel framed building 55’ - 0" x 19'15'-6"

high with corrugated

aluminum

rooting and siding. Along the mdge was a twofoot high continuous metal air ventilator. From
the underside of the roof beams, crane girders
were hung for a two-ton bridge crane moving
from end to end of the building. The flegr of
the building was a reinforced concrete slab poured on grade.
MECHANICAL. The mechanical features included a two-ton bridge crane and forced air
ventilation.

ON

Station 2200 - Aerial View

consisted of chipping away old concrete and

Ov x

—

ELECTRICAL. The electrical svstem was subfed from Station 2200. Standard industrial lighting fixtures were used with a rigid conduit
Wiring system. Power was supplied to receptacles

as desired by the Users.

ENGINEERING, The original design criteria
were received on 20 April 1953. Alterations and
2ddilional criteria were received unm i2 June, &
July, 13 July, 31 July and 7 August. Design
work was started on 18 June. Seven plans were
prepared and submited from 24 June to 16
December. Approval dates varied from 15 July
to 8 January 1954.
CONSTRUCTION.
Work was scheduled to
commence on 1 September and to be completed
on 31 December. Actual construction started on
16 September and was completed on 1 February
1954.

STATION 2211 - DETECTOR STATION

SITE SALLY - USER: UCRL

GENERAL. Same as for Station 2210, with
minor exceptions.

!

ENGINEERING. Sameas for Station 2210.

CONSTRUCTION.

Work was; scheduled to

commence on 15 September and to be completed
on 15 January 1954. Actual construction work

'!
|
t

Page 2-138