CHAPTER II, SECTION 5
formers. Additional concrete slabs, tower and
a mirror platlorm were required.

CONSTRUCTION. Work commenced on 11
March 1954 and was completed on 18 March.

CONSTRUCTION.
Work was scheduled to
commence on 14 October and to be: completed
on 31 December. Actual construction started on
27 Ovtober and completion dates varied trom
t6 January to } February 1054. Station Ps. 105
was started on 30 March 1954 and complete i on
1 April.

STATION Ikti) - INSTRUMENT SHELTER
SITE JANET - USER: NRL

STATION ts40.0t - TRAILER ON BARGE
SITE HOW - USER: NRL

ol

GENERAL. This Station was added an March

1954 due to the rescheduling of the Teer Provram. The work involved consisted of loading
User's equipment on a barge, installing gzener-

aters, erecting a pipe frame over trailers
and providing hving accomodations for six men.
Deadmen, anchors, cable and winch for moonng
were provided.
ENGINEERING. Jobsite Enginecring prepared
tield sketches as required,

GENERAL. This Station was reactivated from
IVY Station sO} in) March 1954 due to the

costheduling of the Test Program. IVY station
“U1 Was a reactivated concrete structure from

GREENHOUSE, station 6B

and sreqnal circutts and additional carth fill and
sandbay protection.

ENGINEERING, Jobsite Engineering prepared
tied <~hetehes as required.
CONSTRUCTION.
Work commenced on 30
March (954 and was completed on 10 April.
STATION 2200 - RECORDING STATION
SITE SUGAR - USER: UCRL
GENERAL, Station 2290, usd for reaction
history. was practically identical with Station

sy

ean bey

3

wee

-_ be

:

« i

a4
’
.

sibs

eaeX

wid
as
S34
°

»

~

es,

wit

tiwes toebingy oom -

PR

,

Me

gy.

HIFMTH

whe

2

-.

Figure 2-146. Station 2200 - C o.ner
Rev iforceement
Page 2-136

Work consisted

instalang a generator and blower, electrical

Select target paragraph3