CHAPTER II, SECTION 5

Figure 2-140.

Station 1550 - 81% Completed

by 31 January 1954. Actual work started on 6
Octoher and was completed on 3 February. Figure 2-137 shows construction of wall forms. The
estimated progress was 30° compieted as shown
on 6 November. Figure 2-138 shows progress of
work in conjunction with Station 1342. Figure

2-140 is looking northwest at Station 1550. The
transmission for Station 1342 (Station 1811.02)
is noted on top of the penthouse. The camera
piers (Station 1303) are noted on top of the
camera bunkers (Station 1342). In the foreground is a submarine cable terminating Station
(ST 3.3) and a timing shack (Station 76). Figure
2-139 shows interior of the second floor.

STATION 1552 - BLOCKHOUSE
SITE JANET - USER: LASL
GENERAL. This Station was a concrete structure reactivated from
IVY Station 3800 in

March 1954 due to the rescheduling of the
Test Program. IVY Station 800 was a reactivation of GREENHOUSE Station 6A. The work
consisted of installing a temporary lighting

system. some additional concrete, and sandbag
protection. It was used in Project 15.1.

ENGINEERING. Field Engineering prepared
field sketches as required.
CONSTRUCTION. Work commenced on 30
March 1954 and was completed on 10 April.
STATIONS 1560.01 - 1560.05

PHOSPHOR AND LIGHT ARRAY

SITES VARIOUS - USER: LASL

GENERAL. Station 1560.02, a Phosphor and

Light Array Station, was located on the Baker-

Charlie Reef. The Station consisted of a 10° - 0”

x 10° - 0” x 37’- 0” high steel tower with a plat'

Page 2-132