CHAPTER It, SECTION 5 945¢ completed. This figure is typical of the MECHANICAL. The electric powered passen- ger hoist was modified by the addition of hoist 1302 series. controls and safety devices. STATION 1302.03 CAB ON 75-FOOT TOWER SITE TARE - USER: EG&G ELECTRICAL. Incandescent lighting, as well as receptacle outlets. as required were provided in the tower cab. Power was supplied from a portable generator. ENGINEERING. GENERAL. Same as Station 1302.02. ENGINEERING. Criteria were received on 15 August. Criteria were received on 15 April. Four drawings and one sketch were started on 29 July, submitted from 18 August to 18 September and approved from 10 September to 6 November. CONSTRUCTION. CONSTRUCTION. Work was scheduled to commence on 1 September and to be substantially completed by 31 December with the exception of the installation of safety devices. All work was scheduled to be completed by 15 February 1954. Actual work started on 8 November and all work was completed on 6 Febtuary. Figure 2-118 shows Station 1302.03 as STATION 1302.04 CAB ON 75-FOOT TOWER SITE JANET - USER: EG&G Scheduled the same as Station 1302.02. Actual work started o1 10 October and was completed on 5 Jecvary 1954. GENERAL. Same as Station 1302.02. CONSTRUCTION. Scheduled the same as Station 1302.02. Actual work started on 8 September and was completed on 20 January 1954. STATION 1303 CAMERA PIERS ON STATION 1342 SITE GEORGE - USER: EG&G GENERAL. This Station, used for technical photography, was located on the roof of Station 1342. The Station consisted of two items: (1) a wood-framed, plywood covered building 6° - 8” x 8-3" x 8’-0” high and (2) a two-foot thick reinforced concrete slab, 15'- 0° x 9°-6", and keved into the roof of Station 1342. Figure 2-5-52 reported under Station 1342 shows the status of work as completed on 5 February. ENGINEERING. Thecriteria were received on 13 August. Structural plans were started on 19 August, submitted on 27 August and approved on 17 September. The electrical drawings were included with Station 1342. CONSTRUCTION. Construction work was scheduled to commence on 1 November and to be completed by 3: December. Actual construction started on 20 December and was completed on 30 January 195-4. STATION 1304 CAMERA PIERS ON STATION 72.03 SITE YVONNE - USER: EG&G GENERAL. This Station, used for technical photography and similar to Station 1303, was oom (FFee Be een renee a Figure 2-118. Page 2-120 ~ located on the rdof of Station 72.03. It was a eeae a wood-framed building 13’ - 6” x 16’ - 0" x 9’- 0” high. ENGINEERING. Criteria received on 1 June changed Station 1302.05 to 1304. On 1 July, Station 1304 was deleted. On 14 August, criteria changed Station 111 to 1304. The design criteria, due to these changes, were received on 20 August. The clectrical drawings were included with those for Station 72.03. Structural Station 1302.03 - Typical of Senes “0 32] + ae wa ete Pett et he + re “a ra on ue eta