CHAPTER It, SECTION 5

945¢ completed. This figure is typical of the

MECHANICAL. The electric powered passen-

ger hoist was modified by the addition of hoist

1302 series.

controls and safety devices.

STATION 1302.03
CAB ON 75-FOOT TOWER
SITE TARE - USER: EG&G

ELECTRICAL. Incandescent lighting, as well
as receptacle outlets. as required were provided
in the tower cab. Power was supplied from a
portable generator.
ENGINEERING.

GENERAL. Same as Station 1302.02.
ENGINEERING. Criteria were received on 15
August.

Criteria were received on

15 April. Four drawings and one sketch were

started on 29 July, submitted from 18 August
to 18 September and approved from 10 September to 6 November.

CONSTRUCTION.

CONSTRUCTION.
Work was scheduled to
commence on 1 September and to be substantially completed by 31 December with the exception of the installation of safety devices. All
work was scheduled to be completed by 15
February 1954. Actual work started on 8 November and all work was completed on 6 Febtuary. Figure 2-118 shows Station 1302.03 as

STATION 1302.04
CAB ON 75-FOOT TOWER
SITE JANET - USER: EG&G

Scheduled the same as

Station 1302.02. Actual work started o1 10
October and was completed on 5 Jecvary 1954.

GENERAL. Same as Station 1302.02.

CONSTRUCTION.
Scheduled the same as
Station 1302.02.
Actual work started on 8
September and was completed on 20 January
1954.

STATION 1303
CAMERA PIERS ON STATION 1342
SITE GEORGE - USER: EG&G
GENERAL. This Station, used for technical

photography, was located on the roof of Station
1342. The Station consisted of two items: (1)
a wood-framed, plywood covered building 6° - 8”
x 8-3" x 8’-0” high and (2) a two-foot thick

reinforced concrete slab, 15'- 0° x 9°-6", and
keved into the roof of Station 1342.

Figure

2-5-52 reported under Station 1342 shows the
status of work as completed on 5 February.

ENGINEERING. Thecriteria were received on
13 August. Structural plans were started on 19

August, submitted on 27 August and approved
on 17 September. The electrical drawings were
included with Station 1342.

CONSTRUCTION.

Construction work was

scheduled to commence on 1 November and to
be completed by 3: December. Actual construction started on 20 December and was completed
on 30 January 195-4.

STATION 1304
CAMERA PIERS ON STATION 72.03
SITE YVONNE - USER: EG&G
GENERAL. This Station, used for technical
photography and similar to Station 1303, was

oom (FFee Be een renee
a

Figure 2-118.

Page 2-120

~

located on the rdof of Station 72.03. It was a

eeae a

wood-framed building 13’ - 6” x 16’ - 0" x 9’- 0”
high.
ENGINEERING. Criteria received on 1 June
changed Station 1302.05 to 1304. On 1 July,
Station 1304 was deleted. On 14 August, criteria changed Station 111 to 1304. The design
criteria, due to these changes, were received on
20 August. The clectrical drawings were included with those for Station 72.03. Structural

Station 1302.03 - Typical
of Senes

“0

32]
+

ae

wa

ete Pett et

he

+

re

“a

ra

on

ue

eta