CHAPTER Ii, SECTION 5

=
oom
eS a

Figure 2-110.

Station 1204.03 - 70% Completed

hand
installed in Station 1200 and a two-ton
operated chain hoist with monorail.
00)
ELECTRICA!.. A special powerhouse (DO-5

delivered power to the Station’s main switchgenerboard, which sub-fed three 30HP motorwas
inator sets. A 10KW gasoline generatar
power.
hot
post-s
d
limite
stalled to supply
ENGINEERING. The original design
were received on 7 April. Additional
were received on 12 May, 16 June, 6
July and 24 July. Extensive changes
trical criteria were received on 15,

criteria
criteria
July, 8
to elec23 and

°6 October and 2 December. Design works ‘art-

ed or. 4 March. Seventeen plans and one sketch
were submitted from 22 May to 2 November,

and approvals were dated from 3 June to 15
December. Revisions were made as late as 10
December.

CONSTRUCTION. Work was originally sched-

Figure 2-111.

Station 1210 - Piacing

Foundatior. Forms

uled to commence on 15 August and to be
completed by 31 Jaruary. Actual work started
on 9 September and was completed on 15 January 1954. Figure 2-111 shows the foundation
forms being placed on 7 October. The progress
was estimated as 1255 completed. Figure 2-112
shows the structure as 45% completed as of
Page 2-115

Select target paragraph3