CHAPTER Ii, SECTION 5 = oom eS a Figure 2-110. Station 1204.03 - 70% Completed hand installed in Station 1200 and a two-ton operated chain hoist with monorail. 00) ELECTRICA!.. A special powerhouse (DO-5 delivered power to the Station’s main switchgenerboard, which sub-fed three 30HP motorwas inator sets. A 10KW gasoline generatar power. hot post-s d limite stalled to supply ENGINEERING. The original design were received on 7 April. Additional were received on 12 May, 16 June, 6 July and 24 July. Extensive changes trical criteria were received on 15, criteria criteria July, 8 to elec23 and °6 October and 2 December. Design works ‘art- ed or. 4 March. Seventeen plans and one sketch were submitted from 22 May to 2 November, and approvals were dated from 3 June to 15 December. Revisions were made as late as 10 December. CONSTRUCTION. Work was originally sched- Figure 2-111. Station 1210 - Piacing Foundatior. Forms uled to commence on 15 August and to be completed by 31 Jaruary. Actual work started on 9 September and was completed on 15 January 1954. Figure 2-111 shows the foundation forms being placed on 7 October. The progress was estimated as 1255 completed. Figure 2-112 shows the structure as 45% completed as of Page 2-115