CHAPTER II, SECTION 5

Figure 2-91.

Station
View
cof 102 - Exterior
.
“et

.

a a

August and was completed on 23 January 1954.
Figure 2-90 notes the interior which was typical
of the Recorder Station series. A pair of 6” pipe
sleeves were located on the rear wall, adjacent

.

to the blast door. In the floor, with cover plate,

weg

was a 6” x 6” trench.

STATION 102 - RECORDING STATION
SITE OBOE - USER: SANDIA

,
c

GENERAL.Similar to Station 101.

"

ELECTRICAL, Similar to Station 101.
MECHANICAL. Similar to Station 101.

3

ad
J

ENGINEERING, Reported under Station 101.

oe

ow

CONSTRUCTION. Work was originally sched-

A. .

pleted by 15 January. Actual work started on

ae

uled to commence on 1 August and to be com-

2 September and was completed on 6 February.
Figure 2-91 shows the Station as 95% completed

as of 8 January. The wing walls and pipes are

shown prior to the earth fill. Figure 2-92 is typi-

cal of the series as completed with earth fill.

we

fo.
nd ;

.

2
oe

,

STATION 103 - RECORDING STATION
SITE OLIVE - USER: SANDIA

Of
we

GENERAL. Same as Station 102.

dy ‘ea

ELECTRICAL. Sameas Station 102.

Al “a

-MECHANICAL. Same as Station 102.
Figure 2-92.

Station 102 - Typic:

of Series

af

|

oO

-Page 2-99

ee

ENGINEERING. Because of an error in the
construction survey, which was not discovered
until final checking of the field notes, this Sta-

-

=

4]
ibe

1 + -— ~- o> arenes dae

Select target paragraph3