CHAPTER II, SECTION 5

ToTFN
a ee LOR
Fee ng
*

Figure 2-80.

Station 50 and Security Area Completed

outside the Station all within a fenced secunty
lighted area. Power was supplied from power
plant, TA-500, to a 112.5 KVA Substation
adjacent to Station 40. This Substation supplied

the power for that area.

ENGINEERING.
on 26 May 1953.
ceived on 31 July,
additional building

Initial criteria were received
Additional criteria were re5 August and 19 August. As
protection was desired, it was

decided to provide a 45-foot by 26-foot high
blast wall. On 20 November the blast wall was

replaced by canvas siding. The initial design

work started on 27 May, the mechanical designs
started on 1 June, and the electrical design

work started on 16 July after the structural

features were firm. Sixteen drawings and one

sketch were prepared and they were submitted

from 7 July to 24 December. Approvals were
dated from 7 August to 8 January 1954. Remote
controled canvas siding was provided which
presented a difficult design problem. Results
~

Ah

trrte

wh 2s eee

an

wee

tha
a

metas
we ee

ORD

*~

aman

as

AeELE

nétahine

neieiiedintateletel =

were satisfactory to the User on the initial test.

o

Figure 2-81.

Station 50 with Canvas Siding
41;87 325

Page 2-92

=

Oe

7.
oo
~
ML ae
a

Figure 2-82.

*

Site Uncle with Clearing Towards
Station 50

Select target paragraph3