CHAPTER Ii, SECTION 4
As this crater area was required for OPERATION CASTLE, it was necessary to fill it, primarily for topographic rather than contamination reasons.
ENGINEERING. Field Engineering prepared
two field sketches.

CONSTRUCTION. The Ruby Crater Fill was
started on 15 February 1953 and completed on
13 May 1953. Figure 2-26 in Section 2 shows
this crater as of 25 March.

CONTRACT ITEM NUMBER A-33
MISCELLANEOUS CONSTRUCTION
SITES VARIOUS
GENERAL. This contract item number covers
61 Miscellaneous Construction jobs on thesites

uy

of Eniwetok and Bikini Avolls that were necessary for the support of the Operation. Some of
the larger jobs consisted of AVR facilities at
site Tare, Blast Damage Repair at sites Elmer
and Fred, Landing Pier at site Yvonne, Typhoon
Hester Clean-up on sites Elmer and Tare, additional camp facilities, contaminated storage
area and storage and dock area grading at Elmer,
and minor rehabilitation to various facilities.
This construction was necessary for maintenance
and rehabilitation of existing facilities to be
used for support of the Operation.
ENGINEERING. Field Enginecring processed
approsimately 45 field sketches for the execution of this work.
CONSTRUCTION, Work was continuous.

Bg, ee
yO
~

ce Mee

onde

Figure 2-44.

Peter-Oboe Airstrip Completed
Page 2-71