UNCLASSIFIED
APPENDIX A
Joint Task Force 7 Cost Report - (FINAL REPORT)
imulative to June 30, 1954 - Reimbursable Work (Cont.)
SCIENTIFIC CONSTRUCTION
Other
Costs
S
Total
Construction
Costs
3
Total
Expenditures
_
to
2
63
Materials
ifs
8
Costs
Labor
Civilian
Fe
a.
2
aterials
%
'Fotal
Operaung
Other
Costs
he
WRRATING COST
435
98
589
2.700
1.433
wo
S12.673
6,971
bay 704
110,307
437,038
795,049
305,777
$145,245
$257,685
$201,267
$596,531
$1,355,483
S1.583,015
31,583,215
Page A-17