U.S. ARMY ENGINEER DIVISION, PACIFIC OCEAN
CORPS OF

ENGINEERS

PROVECT TITLE _Enewetak Cleanup
LOCATION
DRAWING (S) NO.

compuTep By
1.

___KVK

paTe LSNov?6 CHECKED BY

SHS

DATE

DESIGN ANALYSIS

ASSUMPTIONS.
a.

SHNO,.__-__oF____-__
SECTION

No catastrophic movement in the coral reef structure (t 5 feet horiz

or vert) which will result in disastrous effects (major faulting)

is pre-

dicted for the next 2,000 vears.

b.

The mean sea level will vary from 1 foot lower to 5 feet higher than

existing MSL over the next 2,000 years.
c.

Reef material is not removed or excavated (by nature or man) in the

vicinity of the crater or seaward of the crater for a distance of 1,200 feet.
2.

DESIGN SWL.
a.

Max wave will occur when sea level
Rise in HAO level

+

is 5" higher than present elev.
Existing high water level

4.4

5'

= 9!

Under this sea level condition, waves will wash completely over the island
and there will be a very small wave and wind setup.
estimated to be 1 foot.

The combined effect is

The rise in water surface due to atmosphere pressure

drop is estimated to be about 2 feet for a major storm.

b.
3.

Based on the above the design SWL will be 9+1+2=12'.

MNESIGN WAVE.
Based on contf¥élling depth eriteria for waves having periods between

15 and 20 seconds, the design wave height will be:
12 =1.27 = 9.5'
4.

SCOUR.
a.

From the report recently provided by the Navy Command, the ground

surface around the crater has been severely fractured and the beach rock in =
this area is a very thin surface covering over coral, debris and sand.

POD Form 115
4 Jui 70

tw
wr
a
due
coded
pms
on
a
can
ee
dt: RATASN pete ye
a arkT
1,
+ iSFRI
Mate
.
7 ATT Ree

..

Select target paragraph3