17 November 1976
PODED-G
Quarry, Rock Crushing, Screcning and Central Mix Batch Plant Operations for
Cleanup of Enewetok Atoll, MI.
b.

Recommend providing a nearly rectangular shaped stockpile 100
feet wide x 150 feet long. Height is approximately 8 feet.
Clear and level 12 feet beyond the periphery,

Stockpiling waste aggregate (predominately sand) resulting from
aggregate processing operation.

Sand

Produced

=

(32,000 c.y.)(72%)

Stockpiled

23,700 c.y.
6,600

Waste

Washing Loss

=

c.y.

17,1007 c.y.

(32,400 c.y.)(5%)

=

1,650¢ c.y.

Stockpile approximately 17,100 c.y. of excess sand in a nearly Square
area 150 feet on each side.
Height is approximately 13 feet,
Stockpile approximately 1,650 c.y. of washed fines in a nearly square
area 60 feet on each side.
Height is approximately 10 feet.
Generalized layout of aggregate processing area to establish overall
area requirements.
(Conservative estimate)

EACESS
SAND

i *®A,

WASU FE ,
AS
INES

rr

CRUSHER, ~~,
SCREENING,

SAN O

WASH PLANT

‘

3/4" TO
"

No.4

LY

—

Scale;

1" = 200'

Recommend a site encompassed by a 530 feet diameter circle be
designated as an aggregate processing area.

Select target paragraph3