(2)

A salt water system will be provided for the sprinkler

system at the storage yard area, fill station and wash down area.
Water will be drawn from a pit located near the shoreline on the
lagoon side adjacent to the landing ramp.

The fill station will

provide water for the water trucks for dust abatement of the roads.
Another salt water system will provide salt water for the batch,
mixing plants, and crater area.
Crater.

The source of water will be LaCrosse

Cast iron pipe will be placed and anchored with precast

concrete blocks.

Each water system will utilize engine-driven pumps with a spare

*

*

provided for backup.
g.

Mole Construction.

are shown on the drawings.
h,

The requirements for the mole construction

See Appendix F,

Electrical Requirements,

Floodlight for night operation

will be furnished utilizing light sets and generator sets available

My

»

through Army TOE.
i.

See drawings for additional electrical requirements. * .

Quantity Estimates and Cost Data,

See Appendix E,

(Rev, 16Dec76)

Select target paragraph3